DECISION SUPPORT SYSTEM DESIGN MODEL FOR PRODUCTION RESULT EVALUATION IN CENTRAL JAVA AUTOMOTIVE COMPANY
Abstract
Effective decision making requires the implementation of a Decision Support System (DSS) that combines data, automated simulation models, and interactive visualization. This DSS plays a role in improving the efficiency of machine scheduling, identifying production lines that require overtime, and designing action plans for lines that fail to achieve production targets. The use of Macro VB Excel facilitates the acceleration of data collection and problem analysis using fishbone diagrams and FMEA, which reduces analysis time by 2.7 hours and requires additional overtime of 6.1 shifts to achieve the production target of 19,277 pcs. In the production meeting, four action plans were proposed including the creation of Standard Operating Procedures to reduce machine adjustments, routine overtime assignments, different operations for materials from certain suppliers, and standardization of parameters for each production process.
Downloads
References
Achmad, F. A., & Rumbyarso, Y. P. A. (2023). Analisis Struktur Slab On Pile terhadap Kontrol Lendutan pada Proyek Jalan Tol Kataraja. Jurnal Pendidikan Tambusai, 7(2), 13457-13467.
Achmad, F. A., & Rumbyarso, Y. P. A. (2024). Analisis Penjadwalan Proyek Klinik Spesialis Mata & Tht Ayani Dengan Pert & Cpm. International Journal Of Multi Science, 4(01), 1-8.
Abidin, Z., & Rumbyarso, Y. P. A. (2024). PCI-Analyzed Administrative Way Damage. Larisa Teknik Sipil, 1(1), 8-14.
Arga RumbyarsoY., & PribadiG. (2024, September 30). Analisis Kapasitas Daya Dukung Bore Pile Pada Proyek Gedung Fakultas Hukum Unisulla Semarang Jawa Tengah. Pasak: Jurnal Teknik Sipil Dan Bangunan, 2(1), 1-5. https://doi.org/https://doi.org/10.32699/pasak.v2i1.6976
Arga Rumbyarso, Y. P. (2024). Buku Ajar Struktur Beton Prestress.
Arga Rumbyarso, Y. P. (2024). Kinerja Struktur Gedung Office 36 Lantai: Analisis History dan Pushover.
Arga Rumbyarso, Y. P. (2021). Pengukuran Kinerja Perusahaan PT. Ritra Cargo Indonesia Menggunakan Balanced Scorecard.
Artiani, G. P., Rodji, A. P., Sihombing, S. M., Arga, Y. P., & Pribadi, G. (2023). PERENCANAAN SUMUR RESAPAN UNTUK PENGENDALIAN BANJIR DI WILAYAH KECAMATAN PASAR REBO, JAKARTA TIMUR. Abdimas Galuh, 5(2), 1008-1018.
Artiani, G. P., Rodji, A. P., Sihombing, S. M., Arga, Y. P., & Pribadi, G. PERENCANAAN SUMUR RESAPAN UNTUK PENGENDALIAN BANJIR (STUDI KASUS: SUB BWP KECAMATAN PASAR REBO, JAKARTA TIMUR) DESIGN OF INFILTRATION WELLS FOR FLOOD CONTROL (CASE STUDY: SUB BWP, PASAR REBO DISTRICT, EAST JAKARTA).
Ashshiddiq, F. R., Rumbyarso, Y. P. A., & Siagian, B. M. (2024). ANALYSIS OF FLEXURAL STRENGTH OF BEAM USING BAMBOO REINFORCEMENT. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(02), 97-103.
Darmiyanti, L., Prima, Y., & Aldianto, M. A. (2023). Analisis Borepile Menggunakan Metode Meyyerhoff dan Reese Wright. Jurnal Sipil Krisna, 9(1), 27-38.
Farhan, M. F. F., Rumbyarso, Y. P. A., & Siagian, B. M. (2024). Analisa Penjadwalan Proyek Menggunakan CPM dan PERT Pada Proyek Pembangunan Gedung KONI Jakarta Pusat. Jurnal Teknik dan Teknologi Indonesia, 2(3), 1-11.
Fransiscus, R., Sihombing, S. M., & Prima, Y. (2022). ANALISIS TEBAL PERKERASAN LENTUR PADA JALAN TOL AKSES MENUJU BANDARA INTERNATIONAL KERTAJATI. Jurnal Sipil Krisna, 8(1), 50-61.
Pribadi, G., & Rumbyarso, Y. P. A. (2024). ANALISIS UJI TEKAN BETON MENGGUNAKAN BAHAN LIMBAH KARET DILATASI KONDISI CURING DENGAN AIR LAUT. Jurnal Konstruksi Teknik Sipil, 1(3), 203-213.
Gamaliel, B., & Rumbyarso, Y. P. A. (2022). PELATIHAN DESIGN GAMBAR DENGAN APLIKASI AUTOCAD 2D UNTUK SISWA/I SMK YAPPA DEPOK. KRIDA CENDEKIA, 1(09).
GIOVANNI, D., RUMBYARSO, Y. P. A., & SIAGIAN, B. (2024). ANALYSIS OF CONCRETE COMPRESSIVE STRENGTH WITH PARTIAL SUBSTITUTION OF IRON POWDER WASTE AS FINE AGGREGATE. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(02), 122-129.
Lydia, D., Sahat, S., & Yonas, P. (2023). PENGARUH ELEKTROOSMOSIS TERHADAP KUAT GESER TANAH LEMPUNG. Konferensi Nasional Teknik Sipil (KoNTekS), 1(6).
Pribadi, G., & Rumbyarso, Y. P. A. (2024). Model Perkuatan Anyaman Bambu pada Subgrade Bungker Tangki Pendam. Jurnal Ilmiah Universitas Batanghari Jambi, 24(3), 2530-2535.
Pribadi, G., & Rumbyarso, Y. P. A. (2023). Analisis Profil Atap Baja WF dengan Metode LRFD Menggunakan SAP 2000 dan Idea StatiCa. Jurnal Teknik Industri Terintegrasi (JUTIN), 6(4), 1543-1559.
Pribadi, G., & Rumbyarso, Y. P. A. (2023). Analisis Perbandingan Daya Dukung dan Penurunan Pondasi Tiang Bor Dengan Perhitungan Manual dan Software ALLPILE. Jurnal TESLINK: Teknik Sipil Dan Lingkungan, 5(2), 16-20.
Pribadi, G., Rumbyarso, Y. P. A., & Sakti, E. M. S. (2023). Pelatihan Merancang Gambar Dengan Aplikasi Autocad untuk Pembekalan Siswa SMK dalam Memasuki Dunia Kerja. Media Abdimas, 2(2), 52-56.
Prima, Y., & Pribadi, G. (2023). Penggunaan Program Plaxis Dalam Studi Penelitian Perkuatan Geotextile Pada Kestabilan Lereng Buatan. Jurnal Sipil Krisna, 9(1), 22-26.
Prima, Y., & Darmiyanti, L. (2023). Analisis Kinerja Struktur Gedung Rusun TNI AU Halim Perdanakusuma Dengan Menggunakan Metode Pushover Analysis. Jurnal Sipil Krisna, 9(2), 26-35.
Prima, Y. (2022). ANALISIS DAYA DUKUNG KAWASAN PENDIDIKAN STT WASTU KENCANA (STUDI KASUS GEDUNG STT WASTUKENCANA). Jurnal Ilmiah Plano Krisna, 18(1).
Rinjoko, N. F., Rumbyarso, Y. P. A., & Darmiyanti, L. (2024). THE EFFECT OF GRANITE WASTE AS A FINE AGGREGATE SUBSTITUTION IN ASPHALT CONCRETE BINDER COURSE. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(02), 56-62.
Rumbyarso, Y. P. A. (2024). Aplikasi Perangkat Lunak Plaxis dan Geostudio dalam Studi Subsiden Tanah di Kecamatan Tarumajaya akibat Pemanfaatan Air Tanah Berlebih. Jurnal Teknologi dan Sains Modern, 1(3), 100-108.
Rumbyarso, Y. P. A., & Pribadi, G. (2024). Analisis Kapasitas Daya Dukung Bore Pile Pada Proyek Gedung Fakultas Hukum Unisulla Semarang Jawa Tengah. Pasak: Jurnal Teknik Sipil dan Bangunan, 2(1), 1-5.
Rumbyarso, Y. P. A. (2023). Re-planning of Concrete Structures in the Ngoro Dormitory Project in Surabaya. Journal of Applied Science, Engineering, Technology, and Education, 5(1), 15-24.
Rumbyarso, Y. P. A., & Pribadi, G. (2023). Analisis Stabilitas Lereng dengan Metode Bishop pada Proyek Geotechnical Investigation Jalur Transportasi Pelabuhan Batubara Marangkayu Kabupaten Kutai Kartanegara. JURNAL KRIDATAMA SAINS DAN TEKNOLOGI, 5(02), 562-577.
Rumbyarso, Y. P. A. (2023). Penyuluhan Komposisi Campuran Beton untuk Jalan Tol. Journal of Social Work and Empowerment, 2(3), 137-144.
Rumbyarso, Y. P. A. (2022). Analisis Perkuatan Rangka Atap Baja pada Bangunan Gedung Heritage 1921 Menggunakan Software SAP 2000. Jurnal Teknik Indonesia, 1(1), 1-8.
Rumbyarso, Y. P. A., & Pribadi, G. (2022). Penyuluhan Tentang Pentingnya Sebuah Kontruksi Bagunan Rumah Yang Baik Serta Tahan Gempa. Krida Cendekia, 1(08).
Rumbyarso, Y. P. A. (2021). PERENCANAAN STRUKTUR BANGUNAN ATAS (UPPER STRUCTURE) GEDUNG STIE BANK BPD JATENG KOTA SEMARANG. TEKNOKRIS, 24(1), 1-7.
Rumbyarso, Y. P. A. (2019). Perencanaan Struktur Bangunan Atas (Upper Structure) Gedung Stie Bank Bpd Jateng Kota Semarang. Teknokris, 22(1).
Rumbyarso, Y. P. A. (2022). Analysis Of Compressive Strength Of Concrete By Using Slag Circum As A Concrete Aggregate Mix. International Journal Of Multi Science, 2(12), 35-46.
Rumbyarso, Y., Chusna, N., & Khumaidi, A. (2022). Dissolved Oxygen Prediction of the Ciliwung River using Artificial Neural Networks, Support Vector Machine, and Streeter-Phelps. Jurnal Ilmiah Merpati (Menara Penelitian Akademika Teknologi Informasi), 10(3), 180-190.
Rumbyarso, Y. P. A., & Ulum, R. B. (2021). Analisis Pengaruh Penggunaan Cangkang Telur Bebek Ras Petelur Sebagai Filler Pada Campuran Aspal Beton. Jurnal Teknologika, 11(2), 115-124.
Rumbyarso, Y. P. A. (2023). PERHITUNGAN PRODUKTIVITAS PERALATAN BERAT PADA PROYEK JALAN TOL SEMARANG–DEMAK SEKSI 1C KM 35+ 400 SAMPAI DENGAN 36+ 400. Mechonversio: Mechanical Engineering Journal, 6(2), 34-39.
Rumbyarso, Y. P. A., & Pribadi, G. (2024). Analysis of Landslide Handling With Mini Pile Reinforcement Using Plaxis Software on The “X” Toll Road Project. Jurnal Teknik Industri Terintegrasi (JUTIN), 7(2), 801-810.
Rumbyarso, Y. P. A. (2024). Analisis Perbandingan Kinerja Struktur Tahan Gempa Pada Wilayah Berbeda Dengan Metode Respon Spektrum (Studi Kasus: Apartemen 19 Lantai). Pasak: Jurnal Teknik Sipil dan Bangunan, 1(2), 69-72.
Rumbyarso, Y. P. A., Pribadi, G., & Achmad, F. A. (2023). PENGENALAN DASAR–DASAR PENGOLAHAN DATA PADA SMK PGRI 4 JAKARTA MENGGUNAKAN APLIKASI SPSS. KRIDA CENDEKIA, 2(02).
Rumbyarso, Y. P. A., & Fariqi, A. (2024). Learning Obstacle On Integral (Antiderivative) Material In Didactic Situation Theory. Larisa Teknik Sipil, 1(1), 1-7.
RUMBYARSO, Y. P. A., & Pribadi, G. (2024). ANALYSIS OF CONCRETE COMPRESSIVE STRENGTH WITH COCONUT FIBER WASTE AS A PARTIAL REPLACEMENT OF FINE AGGREGATE. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(02), 130-135.
Rumbyarso, Y. P. A., Pribadi, G., & Addin, F. (2024). PENGENALAN DAN PELATIHAN AUTOCAD UNTUK MENINGKATKAN KETERAMPILAN SISWA SMA YAPEMRI DEPOK. KRIDA CENDEKIA, 3(02).
Saifulloh, R., Rumbyarso, Y. P. A., & Sukadi, S. (2024). Analisis Pengaruh Penggunaan Limbah Cangkang Siput Pada Campuran Asphalt Concrete-Wearing Course (AC-WC). Madani: Jurnal Ilmiah Multidisiplin, 2(8), 202-216.
Sihombing, S. M., Darmiyanti, L., & Prima, Y. PENGARUH ELEKTROOSMOSIS TERHADAP KUAT GESER TANAH LEMPUNG. PROSIDING Konferensi Nasional Teknik Sipil 17.
Taqwa, I., Rumbyarso, Y. P. A., & Darmiyanti, L. (2024). ANALYSIS OF LIGHTWEIGHT BRICK WASTE FOR PARTIAL SUBSTITUTION OF FINE AGGREGATE ON CONCRETE COMPRESSIVE STRENGTH. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(02), 34-41.
Ulum, R. B., Rumbyarso, Y. P. A., Akbar, M. A., & Utami, D. PERANCANGAN MODEL ANALISIS SISTEM PENDUKUNG KEPUTUSAN UNTUK EVALUASI PENCAPAIAN HASIL PRODUKSI DI PERUSAHAAN OTOMOTIF DI JAWA BARAT.
Wahyudi, T., Rumbyarso, Y. P. A., & Siagian, B. M. (2024). THE EFFECT OF FISH BONE POWDER WASTE AS A FINE AGGREGATE SUBSTITUTION IN ASPHALT CONCRETE WEARING COURSE PAVEMENT. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(02), 63-69.
Yonas, P. Infrastruktur Pembaharu Silica Fume in Asphalt Concrete-Wearing Course.
Yonas Prima, A. R. Kinerja Struktur Gedung 36 Lantai Analisis Time History Dan Pushover.