PROJECT SCHEDULING WITH CPM AND PERT METHODS ON THE PT. JAKARTA INDUSTRIAL ESTATE PULOGADUNG MOSQUE CONSTRUCTION PROJECT

  • FAIZAL ADDIN ACHMAD Civil Engineering Study Program, Krisnadwipayana University
  • YONAS PRIMA ARGA RUMBYARSO Civil Engineering Study Program, Krisnadwipayana University
Keywords: projects, CPM and PERT, construction

Abstract

Project implementation requires accurate planning, scheduling, and management, covering various aspects such as resources, availability of materials, equipment, natural conditions, weather, and other factors that affect project development. Project planning reflects the relationship between activities and the overall project sequence, and helps in prioritizing the relationship between activities. Various methods are available to analyze project schedules. This research uses the Critical Path Method and Progam Evaluation and Review Technique, which is slightly different from the approach used in the construction of the Mosque at PT Jakarta Industrial Estate Pulogadung. In this study, Microsoft Project software was used for the calculation of CPM and PERT methods. Based on the analysis results, 6 work items were found to be on the critical path, namely: preparatory work, lower structure, upper structure, architecture, hardscape and softscape. The project completion time is estimated to be 105 days with the CPM method and 101 days with the PERT method, with a project completion opportunity of 37.37%.

Downloads

Download data is not yet available.

References

Rahayu, T., & Darmiyanti, L. (2019). Sosialisasi Penanganan Air Limbah Rumah Tangga Di Karawang. Jurnal Solma, 8(2), 287-294.
Darmiyanti, L., Pribadi, G., & Rodji, A. P. (2021). Penambahan Serbuk Kayu Kamper terhadap Kuat Tekan Beton. Bentang: Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil, 9(2), 85-92.
Darmiyanti, L., & Wiharja, U. (2024). Effect of Salt Solution in Electrochemical Stabilization with Variation of Potential Difference on Clay's Shear Strength. Reka Buana: Jurnal Ilmiah Teknik Sipil dan Teknik Kimia, 9(1), 28-40.
Rachmansyah, A., Darmiyanti, L., & Kusumaningrum, R. (2023, October). Expansive soil improvement using electrochemical injection. In IOP Conference Series: Earth and Environmental Science (Vol. 1249, No. 1, p. 012039). IOP Publishing.
Darmiyanti, L., Rodji, A. P., & Mumtaz, A. (2022). Perencanaan Struktur Atap Frofil Baja Wf. Journal of Sustainable Civil Engineering (JOSCE), 4(02), 99-121.
Darmiyanti, L. (2022). Kinerja Kapasitas Lalu Lintas Jalan Mustika Jaya Bekasi Dipengaruhi Oleh Hambatan Samping Jalan. Konferensi Nasional ke 16.
PENGURANGAN, P. M. D., DAN, S., & UNKRIS, L. (2023). SIKAMA: Jurnal Pengabdian Kepada Masyarakat.
Darmiyanti, D., Rachmansyah, A., Munawir, A., Zaika, Y., & Suryo, E. A. (2023, November). Voltage optimization in expansive soil improvement with saline solution on swelling and shear strength. In IOP Conference Series: Earth and Environmental Science (Vol. 1263, No. 1, p. 012050). IOP Publishing.
Susilo, M. F. T., Rodji, A. P., & Darmiyanti, L. (2022). Analisis Tebal Perkerasan Lentur Pada Apron Pangkalan Udara Saumlaki di Tanimbar Maluku. Jurnal Sipil Krisna, 8(1), 1-10.
Darmiyanti, L. (2024). Perbaikan potensi pengembangan tanah ekspansif dengan metode elektrokinetik menggunakan larutan kalsium dioksida. Jurnal Teknik Sipil, 5(1), 10-14.
Cahyani, G., Darmiyanti, L., & Pribadi, G. (2024). ANALYSIS OF BUILDING BEAMS CALCULATION FOR EMPLOYEE MESS IN KONAWE SOUTHEAST SULAWESI. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(02), 76-83.
Windasari, W., & Darmiyanti, L. (2004). Pengaruh Jarak Dukungan Lateral terhadap Kapasitas Lentur Balok Vierendeel.
Darmiyanti, L. (2024). SOSIALISASI DAN KOLABORASI MELALUI E-COMMERCE DI DESA TUGU UTARA. SIKAMA: Sinergi Akademisi dan Masyarakat, 2(1), 30-36.
Darmiyanti, L., & Tambunan, S. H. (2022). ANALISIS KUAT TEKAN BETON MENGGUNAKAN LIMBAH KERAMIK SEBAGAI PENGGANTI SEBAGIAN AGREGAT KASAR. Jurnal Sipil Krisna, 8(1), 11-20.
Ikhwan, B. K., Darmiyanti, L., & Pribadi, G. (2025). PERBANDINGAN DAYA DUKUNG DAN PENURUNAN BORED PILE BERDASARKAN DATA SPT DAN LOADING TEST. Jurnal Teknik Sipil, 5(2), 61-71.
Sihombing, S. M., Artiani, G. P., & Darmiyanti, L. (2022). ANALISIS STRUKTUR BANGUNAN TERHADAP ELEMEN HORIZONTAL PADA GEDUNG PENYIMPANAN KPK JAKARTA. Jurnal Sipil Krisna, 8(2), 18-29.
Darmiyanti, L. (2022). ANALISIS TEBAL PERKERASAN LENTUR PADA APRON PANGKALAN UDARA SAUMLAKI DI TANIMBAR MALUKU. URNAL SIPILKRISNA VOL. 8 NO. 1 April 2022.
Castro, F., & Darmiyanti, L. (2020). ANALISIS ELEMEN VERTIKAL PADA STRUKTUR BANGUNAN GEDUNG HOTEL CHADSTONE CIKARANG JAWA BARAT. TEKNOKRIS, 23(1), 42-49.
Darmiyanti, L. ANALISIS PONDASI BORED PILE DENGAN METODE HITUNGAN DAN AXIAL LOUDING TEST. Konferensi Nasional Teknik Sipil 15.
Mohamadhan, R., Pribadi, G., & Darmiyanti, L. (2025). EFFECT OF COMPRESSIVE STRENGTH OF CONCRETE WITH PARTIAL SUBSTITUTION OF FINE AGGREGATES WITH WASTE BAMBOO FIBERS. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 5(01), 31-37.
DENYADI, M. A., & DARMIYANTI, L. (2025). THE USE OF WASTE BAMBOO PIECES AS A PARTIAL SUBSTITUTION OF COARSE AGGREGATES TO INCREASE THE COMPRESSIVE STRENGTH OF CONCRETE. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 5(01), 21-30.
Situmorang, H. K., & Darmiyanti, L. (2024). Analisis Daya Dukung Pondasi Tiang Pancang Berdasarkan Data Sondir Pada Proyek Pembangunan Boarding School. Anggapa Journal-Building design and architecture management studies, 3(2), 19-28.
Hartanto, B. G., & Pribadi, G. (2025). PENINGKATAN JEMBATAN DENGAN MESIN MULTIJACK UNTUK MEMPERBAIKI KUALITAS SERTA KEBERLANJUTAN DESTINASI WISATA. KRIDA CENDEKIA, 3(03).
Hartanto, B. G. (2024). ANALYSIS OF INDUCTION MOTOR EFFICIENCY DECREASE DUE TO CAGE BALL BEARING DAMAGE. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(02), 167-172.
Hartanto, B. G. (2024). PELATIHAN SISTEM PERPIPAAN DAN PERAWATAN SERTA SERVIS AC BAGI MAHASISWA POLITEKNIK NEGERI MEDIA KREATIF. KRIDA CENDEKIA, 3(01).
Gamaliel, B. (2024). IMPLEMENTATION OF AN ELECTRO-PNEUMATIC SYSTEM IN A VALVE SAFETY SUPPORT DEVICE THROUGH LINEAR TO ROTATIONAL MOTION. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 4(01), 15-20.
Gamaliel, B. (2023). ANALISIS TIMBUNAN RINGAN MORTAR BUSA MENGGUNAKAN MESIN KONVERSI ENERGI PADA PROYEK FLY OVER. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 3(06), 21-38.
Gamaliel, B. (2023). OPTIMIZATION OF SUPRA FIT MOTORCYCLE ENGINE MODIFICATION INTO A MACHINE CONVERTING HEAT ENERGY INTO ELECTRIC ENERGY. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 3(04), 211-217.
Pribadi, G., & Hartanto, B. G. (2023). ANALYSIS OF HEAVY EQUIPMENT PRODUCTIVITY IN THE PHASE II KASABLANKA KUNINGAN APARTMENT DEVELOPMENT PROJECT. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 3(04), 218-224.
Hartanto, B. G., & Pribadi, G. (2022). DECISION SUPPORT SYSTEM DESIGN MODEL FOR PRODUCTION RESULT EVALUATION IN CENTRAL JAVA AUTOMOTIVE COMPANY. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 3(03), 147-151.
Pribadi, G., & Hartanto, B. G. (2022). ANALYSIS OF HEAVY VEHICLE PRODUCTIVITY ON THE TERBANGGI BESAR-KAYU AGUNG TOLL ROAD PROJECT KM 30+ 100 TO 30+ 500. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 2(12), 70-76.
Hartanto, B. G., & Pribadi, G. (2021). DESIGN OF DECISION SUPPORT SYSTEM ANALYSIS MODEL FOR PRODUCTION RESULT ASSESSMENT IN AUTOMOTIVE COMPANIES IN EAST JAVA. INTERNATIONAL JOURNAL OF MULTI SCIENCE, 2(06), 84-90.
Hartanto, G. B. (2019). Effect of Knowledge Management and Integrity on Organizational Performance through Organizational Commitment Pt. Bhinneka Mentari Dimensi. East African Scholars Journal of Economics, Business and Management, 2(10).
Hartanto, B. G. (2015). Analisis Mekanisme Aliran Plug Air-Udara Dengan Cecm Berdasarkan Perubahan Diameter Inlet Pipa (Analysis of Water-air Plug Flow Mechanism by Cecm Based on Change of Pipe Inlet Diameter). Mekanik, 1(1), 329130.
Published
2024-12-28